PROJECTS / SEPCO Rehab Power Plant Fogging System Implementation

SEPCO Rehab Power Plant Fogging System Implementation

Middle East and North Africa

November 6, 2025

Based on the results of the technical and economic analysis performed by K&M Advisors as part of a separate assignment, SEPCO made a decision to proceed with implementing a fogging system at the 300 MW combined cycle power plant designed in 2 x 1 configuration and utilizing GE9E gas turbines. SEPCO engaged K&M Advisors to develop a Request for Proposal (RFP) document, assist during the bidding process, conduct proposal evaluations, and prepare a report recommending the winning bidder.

K&M developed the fogging system RFP. The RFP document prepared by K&M included instructions to bidders, functional technical specification including the scope of supply and services and general technical requirements, and forms to be submitted by bidders. The draft supply contract was prepared by SEPCO. Three companies submitted their proposal in response to the RFP. K&M reviewed the proposals, conducted proposal evaluation, including issuing several rounds of clarification questions to the bidders, and prepared the proposal evaluation report recommending the winning bidder.

Share
SEPCO SAMRA Power Plant Advanced Ga
vertical_line-icon

Join Our Team

Open Positions

Contact Us

Get in Touch