Feasibility Study of Three Cogeneration and District Heating Plants
K&M conducted a feasibility study to evaluate the technical and commercial options available to improve efficiency, power and steam output and alleviate environmental concerns of three cogeneration and district heating plants: Ujpest (185 MW), Debrecen (125 MW), and Kispest (165) MWe. K&M’s scope of work included: study and evaluation of the interconnection with the national grid to include stability, load-flow, and short circuit analysis; study and evaluation of the problems and difficulties for plant optimization of operation; and environmental policy review and assessment conforming to the international standard World Bank environmental guidelines.