Temporary Power Procurement
NV GEBE, the integrated Sint Maarten power utility responsible for generation, transmission, and distribution of electricity on the Dutch part of the island, experienced outage of several generating units, which created power shortages and required rolling blackouts on Sint Maarten. NV GEBE intended to resolve this issue in the near term by procuring 20 MW of emergency power and engaged K&M to prepare a Request for Proposal (RFP) for that procurement. K&M studied the power plant supply arrangements at Sint Maarten, assisted the client in selecting the project site, and developed an RFP, including instructions to bidders, evaluation methodology, and technical specification, which included technical requirements and detailed description of project interfaces, K&M was able to prepare the RFP within 2 weeks of the project award.
NV GEBE experienced outage of several generating units, which created power shortages and required rolling blackouts on Sint Maarten. NV GEBE intended to resolve this issue in the near term by procuring 20 MW of emergency power and engaged K&M to prepare a Request for Proposal (RFP) for that procurement. K&M studied the power plant supply arrangements at Sint Maarten, assisted the client in selecting the project site, and developed an RFP, including instructions to bidders, evaluation methodology, and technical specification, which included technical requirements and detailed description of project interfaces, K&M was able to prepare the RFP within 2 weeks of the project award.