Conceptual Design and Cost Estimate for Coking Process
North America
October 22, 2020K&M developed conceptual designs and cost estimates for Coal Technology Corporation’s (CTC) coking process. CTC, with support from the Morgantown Energy Technology Center (METC), developed and patented a process for coke-making which solves significant pollution problems caused by the present coke-making process. K&M reviewed the patented coke-making process design, established site-related design requirements, determined and specified applicable codes, standards and other required regulations, developed equipment layout and building arrangement, developed a project schedule, identified required permits and cognizant federal and state approving entities, prepared bid documents, obtained bids from eligible tenderers for a potential turnkey construction contract, evaluated responsive bids and assisted in negotiating a firm turnkey contract with the winning bidder.
