PROJECTS / Feasibility Study for the Sabamati 130 MW Power Station

Feasibility Study for the Sabamati 130 MW Power Station

South Asia

October 22, 2020

Ahmedabad Electricity Company (India) engaged K&M as the Owner’s Engineer for development and implementation of the proposed IGCC project at the Sabarmati Thermal power Station. This assignment was a follow-up to the previously performed assignment where K&M under the contract with US DOE conducted a pre-feasibility study for constructing a nominal 150 MW IGCC plant at AEC’s Sabarmati Thermal Power station using coal. K&M developed conceptual preliminary design, estimated the Engineering, Procurement, and Construction (EPC) costs, assessed the environmental impact of the project, developed financing plans, and established the Cost of Electricity (COE) generation. K&M then prepared the Detailed Project Report which included equipment specifications and the necessary documents required by lending institutions for financing the project, and subsequently, providing Construction Management for the Project.

Share
World Power Conference Global IPP I
vertical_line-icon

Join Our Team

Open Positions

Contact Us

Get in Touch