Feasibility Study for the Sabamati 130 MW Power Station
South Asia
October 22, 2020Ahmedabad Electricity Company (India) engaged K&M as the Owner’s Engineer for development and implementation of the proposed IGCC project at the Sabarmati Thermal power Station. This assignment was a follow-up to the previously performed assignment where K&M under the contract with US DOE conducted a pre-feasibility study for constructing a nominal 150 MW IGCC plant at AEC’s Sabarmati Thermal Power station using coal. K&M developed conceptual preliminary design, estimated the Engineering, Procurement, and Construction (EPC) costs, assessed the environmental impact of the project, developed financing plans, and established the Cost of Electricity (COE) generation. K&M then prepared the Detailed Project Report which included equipment specifications and the necessary documents required by lending institutions for financing the project, and subsequently, providing Construction Management for the Project.