PROJECTS / Mexico Solar PV Power Project Due Diligence

Mexico Solar PV Power Project Due Diligence

Latin America and the Caribbean

October 22, 2020

K&M has been contracted by EIG Partners to conduct due diligence for a 300 MW solar project in Mexico. K&M is reviewing the engineer’s due diligence reports and yield reports for the Helios and Tuli PV solar projects. K&M will prepare a memo identifying red flags and fatal flaws that were identified during its review of the above reports. K&M may also review technical aspects of the PPAs and EPC contracts, technical inputs to the financial model; and prepare a due diligence report summarizing the results of review of the Mott’s reports and project agreements. K&M may also conduct a site visit to examine the projects.

Share
Seawater Reverse Osmosis (SWRO) Pla
vertical_line-icon

Join Our Team

Open Positions

Contact Us

Get in Touch