PROJECTS / Quindio 45 MW Power Station

Quindio 45 MW Power Station

Latin America and the Caribbean

October 22, 2020

K&M was commissioned by Mitsui to conduct a prefeasibility study to assess the technical and economic feasibility of the 45 MW gas fired power project located in Colombia. As part of this assignment, K&M performed preliminary engineering to select suitable plant configuration and to assess plant performance, prepared preliminary project cost estimate, developed preliminary financial model to evaluate project economics, and prepared the Pre-feasibility Study Report.