Based on the results of the technical and economic analysis performed by K&M Advisors as part of a separate assignment, SEPCO made a decision to proceed with implementing a fogging system at the 300 MW combined cycle power plant designed in 2 x 1 configuration and utilizing GE9E gas turbines. SEPCO engaged K&M Advisors to […]
SAMRA Power Plant, a combined cycle power plant with a capacity of 1160 MW at site ambient conditions, utilizing two 300 MW blocks, each with GE9E gas turbines in 2 x 1 configuration, one 420 MW block with GE132 gas turbines in 2 x 1 configuration, and one block with GE13E2 gas turbine in 1 […]
NEPCO is developing a 600 MW gas-fired combined cycle power plant to be added to the Jordanian generation fleet and initially engaged K&M to perform technical studies to define the technical parameters of the plant. The study since then was approved, and NEPCO engaged K&M so assist them in organizing competitive bidding for selecting a […]
NEPCO is developing a 580 MW gas-fired combined cycle power plant to be added to the Jordanian generation fleet and engaged K&M to perform technical studies to define the technical parameters of the plant. The scope of the studies includes the evaluation of the prospective project sites, selection of suitable gas turbine technologies, and unit […]
K&M understands that from the beginning of the commercial operation, Phase IV Add-on Combined Cycle feedwater pumps experienced high vibration issues and that these issues are not fully resolved despite remedial measures undertaken by SEPCO3, the EPC Contractor, and SEPCO. Specifically, one of the pumps, pump C, still experiences high vibration. On March 8, 2024, […]
The Government of Morocco intends to increase the country’s energy security by reducing its dependence on imports and diversifying its sources of natural gas imports. The Moroccan Ministry of the Energy Transisiton and Sustainable Development has contracted the International Finance Corporation (IFC) to assist in the design and tender of an LNG import and regasification […]
Fogging System Analysis SEPCO has indicated the power grid in Jordan has had difficulty covering peak loads observed during high-temperature periods. As a result, SEPCO has reviewed potential solutions for its Samra Power Plant to increase power plant generation during these peak periods. SEPCO intent is to modify all seven gas turbines installed at the […]
The National Electric Power Company (NEPCO), a national electric utility responsible for operating Jordan’s transmission network planning system expansion including procurement of new generating facilities selected the Attarat Power Company, a private company incorporated in Jordan, whose shares are owned Malaysian, Chinese, and Estonia entities, to develop, design, finance, construct, test, commission, complete, own, insure, […]
K&M was contracted by the International Finance Corporation (IFC), on behalf of the Sultanate of Oman’s Ministry of Electricity and Water, to review the detailed technical and economic feasibility study for a 3×30 MW central power station to be located near Bilah Manah. K&M reviewed the feasibility study and made recommendations on how to improve […]
K&M served as technical consultant to the Egyptian Ministry of Supply under a multi services contract on behalf of the Egyptian Electricity Authority and US Agency for International Development (USAID). K&M completed a design review, provided construction management and start-up services for a 3 x 3 MW diesel generating station located in southern Egypt on […]